Surf Lakes – Engineering Design
Surf Lakes waterbody classification analysis and detailed water treatment reticulation study concurrent with detailed design of an Australian base Surf Park wave generation facility.
Feasibility Study for a Large-scale Water Facility to Support a Hydrogen Project
Feasibility study determining the reliability of existing water sources and define the costs associated with accessing and treating water for a prospective hydrogen project.
Consultancy to Prepare an Integrated Needs Assessment: Water Usage, Accessibility and Storage Needs in Barbados
This needs assessment identifies vulnerable households, polyclinics, schools, communities and farmers that will benefit from implementation of a water storage programme
Permitting and Authorization Identification for Wave Powered Reverse Osmosis Desalination
Oneka Technologies created a Sea Water Reverse Osmosis Unit that desalinates sea water into fresh potable water using only kinetic energy of ocean waves to drive this entire process. A small solar panel on top of the buoy provides power to the controls and communication back to shore. With extensive water treatment expertise and a Barbados office, Integrated Sustainability was retained by Oneka Technologies to navigate the regulatory landscape and process for implementation of the Sea Water Reverse Osmosis Unit in Barbados.
Design and Implementation of an Integrated Blue Economy Policy Framework and Strategic Action Plan for Barbados
Implement an integrated Blue Economy policy framework and strategic action plan with local Caribbean partners and international specialists.
Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Mine Water Management & Infrastructure Planning
TSS management system utilizing innovative passive flocculation technology for water quality management in surface water event ponds.
River Bank Water Intake Filtration
Evaluate 3 sites and several water intake technology options for a 60,000 m3 per day water intake on the Liard River in British Columbia.
Water Intake Engineering, Procurement, and Construction Management
Integrated Sustainability was retained by the client to design a revised river intake that reduces the volume of sediment that is introduced into the raw water supply system. The revised system is to provide increased reliability and easier maintenance. The new design would need to be completed and submitted to receive regulatory approval within a condensed timeline.
SAGD Water Security Assessment & Planning
The client requested that Integrated Sustainability conduct a water risk assessment that included the evaluation of source water, water use, and associated water-related risks in relation to its operations and anticipated developments.
Agricultural Water Supply and Demand Assessment to Support Irrigation System Planning
Continued climate change impacts are expected to result in increased challenges related to both agricultural water demand and supply.
Biophysical Data Amalgamation
Integrated Sustainability has been retained for the amalgamation of biophysical data in anticipation of migration to a new data platform.