Wastewater Containment Structures

Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery

SAGD Water Security Assessment & Planning

The client requested that Integrated Sustainability conduct a water risk assessment that included the evaluation of source water, water use, and associated water-related risks in relation to its operations

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store

Freshwater Containment Structure

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services