The Challenge
Integrated Sustainability was approached to provide engineering services for the design of the earthworks, drainage, access road, and phased construction for a long-term camp supporting a pipeline project.
The Result
Integrated sustainability provides geotechnical and civil engineering, procurement and construction services for the camp. The team will work with the client to assist in evaluating the cost benefit of the earthworks design versus charges and impacts to camp layout.