Develop a strategic plan for risk management of legacy contaminated former refinery site

The Challenge

Developed a formal strategic plan for key external stakeholders to efficiently and proactively identify the potential risks that may remain on the former refinery site.

The Result

Determined potential risks and next steps required to mitigate risk implications. Identified all key stakeholders impacted by the decision. Achieved alignment with all key stakeholders regarding solution.

Related Projects

Source Water Treatment & Pipeline Study

Changing regulatory requirements surrounding the use of fresh water for Steam Assisted Gravity Drainage (SAGD) heavy oil extraction resulted in the need for this study. Through it, Integrated Sustainability was able to provide a quantitative comparison of the capital, operational and maintenance costs of all feasible water options, while validating the basis of design and the technical feasibility of pipeline transport and on-site water treatment.

Read More »

Waste Process Optimization for Operating Cost Reduction

Integrated Sustainability investigated opportunities to improve the management of waste at a gas processing facility in British Columbia in order to achieve operational cost savings. The team was also tasked with developing Class 5 estimates regarding CAPEX investments required to achieve OPEX savings.

Read More »