Industrial River Intake Upgrade

Design a revised river intake that reduces raw water system sedimentation and develop regulatory application.

The Challenge

To design an upgraded river intake that reduces the volume of sediment that is introduced into the raw water supply system. The revised system is to provide increased reliability and easier maintenance. The new design required regulatory approval on a tight timeline and included field site assessments.

The Result

Integrated Sustainability developed and environmental protection and management plan to protect water quality, fish habitat and fish species to ensure no net loss of fish during construction.

Integrated Sustainability also developed preliminary design and regulatory application which were successfully submitted to the regulatory authorities with an approval to construct received.  Subsequent to approval Integrated Sustainability delivered detailed Issued For Construction (IFC) drawings.

Related Projects

Modular Mine Water Treatment Plant

Designed modular mobile treatment packages for a remote mine in the Golden Triangle region of BC. Treatment parameters focused on:
metals & arsenic removal, Ammonia removal and
contingency selenium removal.

Read More »