site logo

Mine Water Management & Infrastructure Planning

Project Execution

Highlights:

  • Designed and implemented a TSS management system utilizing innovative passive flocculation technology for water quality management in surface water event ponds.
  • Conducted assessment of groundwater wells to determine well production capacity for the purpose of providing water to the camp potable drinking water treatment plant, including pumping system assessment.
  • Reviewed sewage collection and septic storage / effluent system.
  • Performed engineering review of camp drinking water treatment system and guided development of engineering documents to confirm proper drinking water sanitation and system function.

ESG Project Benefits:

  • Sustainable water quality management that meets drinking water standards
  • Building resilient systems utilizing innovative solutions

Have Questions?

Let's Discuss​ Mine Water Management & Infrastructure Planning