Project

Mine Water Treatment Plant – Northern B.C.

Groups Involved

Water and Wastewater

Have Questions? Let's discuss Mine Water Treatment Plant – Northern B.C.

Contact Us

Project Execution

Highlights:

  • Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria
  • The selenium treatment system can perform up to 6,500 m3/day
  • The metals remove system can perform up to 16,000 m3/day
  • Major Process Equipment:
    • Chemical Injection Skid with 5 main reagents
    • Multi Media Filtration
    • Ion Exchange Unit + Electro Reduction Unit
    • Process Tanks
    • Clarification Unit
    • Filter Press (Sludge Dewatering)
  • Integrated Sustainability provided discipline engineering including plant layout optimization and piping design to maximize performance while reducing footprint and cost
  • Delivered with BQE Water ( BQE ion exchange / electro reduction technology developer)