Plant Layout Optimization and Piping Design

Project Execution

Highlights:

  • Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria
  • The selenium treatment system can perform up to 6,500 m3/day
  • The metals remove system can perform up to 16,000 m3/day
  • Major Process Equipment:
    • Chemical Injection Skid with 5 main reagents
    • Multi Media Filtration
    • Ion Exchange Unit + Electro Reduction Unit
    • Process Tanks
    • Clarification Unit
    • Filter Press (Sludge Dewatering)
  • Integrated Sustainability provided discipline engineering including plant layout optimization and piping design to maximize performance while reducing footprint and cost
  • Delivered with BQE Water (BQE ion exchange / electro reduction technology developer)

ESG Project Benefits:

  • Sustainable management of water by treating water to meet environmental discharge criteria
  • Design optimization using innovative solutions
  • Minimize land disturbance
  • Responsible water consumption through the re-introduction of water into the environment

Related Projects

Permian Basin Water Chemistry & Treatment Evaluation

Scale formation in the client’s produced water pipeline has been a challenge, resulting in unnecessary pigging and chemical treatment costs. The client requested that Integrated Sustainability conduct and evaluation to mitigate the scale formation as well as determine an optimal approach to reuse of produced water.