Modular Mine Water Treatment Plant

Project Title

Modular Mine Water Treatment Plant

Groups Involved
Project Tags

Have Questions? Let's Discuss​ Modular Mine Water Treatment Plant

Remote water treatment design

Project Execution

Highlights:

  • Designed modular mobile treatment packages for a remote mine in the Golden Triangle region of BC.
  • Treatment parameters focused on:
    • Metals & arsenic removal
    • Ammonia removal
    • Contingency selenium removal
  • Considerations needed to account for a lack of access road, the water treatment plant had to be engineering to be air lifted into the remote site.
  • Customized solutions for varying inlet characteristics were provided to achieve a maximum treated outlet of 4,320 m3/day.
  • Mine Dry & contingency treatment integrated into design.
  • Major Process Equipment:
    • Tubular Filtration
    • Chemical Injection Packages
    • Sulfide Precipitation & Ferric Co Precipitation Reactors
    • Breakpoint Chlorination System
  • Delivered in partnership with BQE Water.

Related Projects

Industrial Boiler Optimization Study

Evaluate the potential process advantages and operational issues associated with boiler “rifle tube” retrofits for an Industrial Water Treatment Plant. Moreover, it was critical to consider additional equipment required, and whether increased maintenance wold be needed.

Read More »

Wastewater Containment Structures

Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery with an Unmanned Aerial Vehicle (UAV), which was used to provide periodic excavation and fill volumes. Provided onsite QA/QC construction services. Successful in obtaining approval from BC Regulator. Implementation of an innovative outtake system.

Read More »