Selected an Appropriate Pipeline Route with Minimal Field Investigation by Utilizing Desktop Tools

The Challenge

Integrated Sustainability was tasked with selecting an appropriate pipeline route to carry and unconfirmed volumetric flow rate of natural gas to connect into a major transmission line connecting to the British Columbia coast. The criteria for success was to eliminate unnecessary crossings, keep costs down by keeping length to a minimum, and to avoid landowners of stakeholders who may object.

The Result

A pipeline route that minimizes intersection with environmentally sensitive areas while providing direct routing. This was accomplished through the use of desktop tools with minimal field investigations.