SAGD Production Waste and Water Study

Have Questions? Let's Discuss​ SAGD Production Waste and Water Study

Investigate Water Treatment Technologies and Optimization Strategies to Reduce Disposal Costs for a Thermal Power Plant

The Challenge

A study designed to provide a detailed overview of current operational conditions of a thermal energy plant, which consists of drafting piping and instrumentation diagram (P&IDs) and process flow diagrams (PFDs), sampling plan, and an evaluation of the water chemistry. Following the completion of the water chemistry evaluation, Integrated Sustainability conducted a multi-criteria evaluation which assessed water treatment technologies and optimization strategies to reduce disposal costs.

The Result

The cooling towers onsite receive a variety of wastewater streams including reverse osmosis concentrate, water from drain tanks, evaporate blowdown, and other re-use flow from treatments. Under normal operating conditions the plant produces approximately 40-80 m³/day of wastewater at an average disposal cost of $20/m³ and is transferred to a nearby disposal well. The scope of work for this project included:

  • Compiling and updating process and instrumentation drawings (P&IDs) and process flow diagrams (PDFs) to produce up to date drawings for operations and future work as well as to identify key locations for collecting water samples
  • A review of available chemical analyses to complete a heat and material balance (H&MB) on the PFDs

ESG Project Benefits:

  • Enhancing energy efficient infrastructure that reduces water, waste and air pollution

Related Projects

SAGD Wastewater Process Optimization

A disposal formation was over pressurizing and impacting operational performance for SAGD operating facilities by limiting disposal volume. Integrated Sustainability was retained to both evaluate and recommend alternate disposal options and new technologies that could reduce liquid waste by enhancing process recycle and reuse.