Full Evaluation of Costs and Associated Risk of Two Pipeline Routes for Water Supply and Wastewater Disposal

The Challenge

Integrated Sustainability was tasked with evaluating the costs and benefits of two water/wastewater pipeline routes. In addition, the team was responsible for the consideration of two distinct pipeline configurations:

  1. Single pipeline for supply and disposal water
  2. Separate pipelines for the two facilities to provide source and disposal autonomy to both projects

The Result

After careful consideration, one of the two routes was selected due to lower costs, favourable terrain, and lower environmental risk.

The separate pipeline option was preferred despite approximately 10% higher costs due to the advantages of additional redundancy.

Related Projects

Waste Process Optimization for Operating Cost Reduction

Integrated Sustainability investigated opportunities to improve the management of waste at a gas processing facility in British Columbia in order to achieve operational cost savings. The team was also tasked with developing Class 5 estimates regarding CAPEX investments required to achieve OPEX savings.