Water Hub Site Selection and Design

The Challenge

Integrated Sustainability was contracted to help with the site identification process, including review of existing geotechnical investigations, recommending two of four sites for selection, and supporting the client during regulatory applications.

The Result

Third party review of geotechnical investigations identified additional geotechnical issues, resulting in a renewed phase of site identification, as well as a new regulatory application Integrated Sustainability supported.

Once site selection was completed Integrated Sustainability was further awarded, and subsequently delivered, preliminary engineering designs for a lake intake, conveyance pipelines, and fresh water storage ponds.